Continuous monitoring
14.00
14.00
12.00
12.00
10.00
10.00
8.00
pH 8.00
pH 6.00
6.00 • Sampling interval can vary to fit the
4.00
4.00 sites needs.
2.00
2.00
0.00 • Monitoring signal can be used to
0.00
00:00:00 04:48:00 09:36:00 14:24:00 19:12:00 00:00:00 04:48:00
00:00:00 04:48:00 09:36:00 14:24:00 19:12:00 00:00:00 04:48:00 sound alarm conditions.
Time
Time
• Enables understanding of the
28 variability in the data.
26 28
24 26
24
22 22 • Enables links between results and site
Flow Rate (m3/hr) 20
Flow Rate (m3/hr) 16 18 processes to be better understood.
20
18
16
14
14
12
12
10
10
4 8 6 8 6 4
2
0 2
0
00:00:00 04:48:00 09:36:00 14:24:00 19:12:00 00:00:00 04:48:00
00:00:00 04:48:00 09:36:00 14:24:00 19:12:00 00:00:00 04:48:00
Time
Time
johnfhuntregeneration.co.uk +44(0)1375 366 700 info@johnfhuntregeneration.co.uk