Page 28 - Water Pollution Management - Environmetal Legislation - Your Responsibility
P. 28
Temporary de-watering from excavations to
surface water (3)
Before starting work on site you must:
• plan how to minimise the level of contaminants such as silt entering the excavation
• plan how to dispose of water that enters the excavation
• plan not to use machinery in excavations while dewatering is taking place
• minimise water entering the excavation, for example from rainfall, runoff, groundwater ingress or high water table
• consider using sustainable urban drainage construction methods