Temporary de-watering from excavations to


         surface water (3)





         Before starting work on site you must:






         •   plan how to minimise the level of contaminants such as silt entering the excavation

         •   plan how to dispose of water that enters the excavation


         •   plan not to use machinery in excavations while dewatering is taking place

         •   minimise water entering the excavation, for example from rainfall, runoff, groundwater ingress or high water table

         •   consider using sustainable urban drainage construction methods