Page 26 - Water Pollution Management - Environmetal Legislation - Your Responsibility
P. 26
Temporary de-watering from excavations to
surface water (1)
Conditions you must comply with:
The discharge must:
• be clean water, for example clear rainwater or infiltrated groundwater
which has collected in the bottom of temporary excavations
• not result in water containing fine or coarse suspended solids (silty water)
entering surface water
• not last more than 3 consecutive months (the activity may stop and
restart but the clock does not restart) - if the activity is likely to go over 3
consecutive months then you need to apply for a permit
• be made to surface water, such as a river, stream or the sea
• have a method statement that minimises the risk of pollution
johnfhuntregeneration.co.uk +44(0)1375 366 700 info@johnfhuntregeneration.co.uk